Pengaruh Tata Letak Produksi Terhadap Efisiensi Usaha dan Daya Saing UD. Barokah Lamongan
Abstract
This study aims to determine the effect of a number of factors that influence the provision of going concern audit opinions on manufacturing companies on the Indonesia Stock Exchange. In this study, the factors that are thought to influence the provision of going concern audit opinions consist of audit tenure, opinion shopping, audit delay and financial distress. The data analysis method used is binary logistic regression. Based on the results of hypothesis testing, it was found that audit tenure and opinion shopping had no significant effect on going concern audit opinions on manufacturing companies on the Indonesia Stock Exchange, while audit delay and financial distress had a significant effect on going concern audit opinions on manufacturing companies on the Indonesia Stock Exchange.
ABSTRAK
Penelitian ini bertujuan mengetahui pengaruh sejumlah faktor yang mempengaruhi pemberian opini audit going concern pada perusahaan manufaktur di Bursa Efek Indonesia. Pada penelitian ini faktor yang diduga mepengaruhi pemberian opini audit going concern terdiri dari audit tenure, opinion shoping, audit delay dan financial distress. Metode analisis data yang digunakan adalah regresi binary logistic. Berdasarkan hasil pengujian hipotesis ditemukan audit tenure dan opinion shoping tidak berpengaruh signifikan terhadap opini audit going concern pada perusahaan manufaktur di Bursa Efek Indonesia, sedangkan audit delay dan financial distress berpengaruh signifikan terhadap opini audit going concern pada perusahaan manufaktur di Bursa Efek Indonesia.
References
Abdilla, M., & Agus, I. (2021). Keputusan Pembelian Online Saat Pandemi Covid 19 di Fakultas Ekonomi Dan Bisnis Universitas Dharma Andalas. Jurnal Ekonomi Dan Bisnis Dharma Andalas, 23(1), 123–134. https://doi.org/10.47233/jebd.v23i1.207
Amalia, R. R., Ariyani, L., & Noor, M. (2017). Perancangan Ulang Tata Letak Fasilitas Industri Tahu dengan Algoritma Blocplan Di UD. Pintu Air. Teknologi Agro-Industri, 4(2), 89–100.
Araújo, M., Amaral, G., & Varela, L. (2017). Improving productivity and standard time updating in an industrial company - A case study. International Journal of Mechatronics and Applied Mechanics, 2017(1), 139–144. https://doi.org/10.17683/ijomam.issue1.22
Damaledo, Y. D. (2019). Mondelez Rilis Survei Soal Kebiasaan & Tren Ngemil Orang Indonesia. Tirto.Id. https://tirto.id/mondelez-rilis-survei-soal-kebiasaan-tren-ngemil-orang-indonesia-emQF
Daya, M. A., Sitania, F. D., & Profita, A. (2018). Perancangan Ulang (re-layout) tata letak fasilitas produksi dengan metode blocplan (studi kasus: ukm roti rizki, Bontang). PERFORMA Media Ilmiah Teknik Industri, 17(2), 140–145. https://doi.org/10.20961/performa.17.2.29664
Habi Adi, I., & Handayani, W. (2020). Perancangan ulang tata letak gudang produk untuk meningkatkan efesiensi proses bongkar muat. 6. https://jurnal.narotama.ac.id/index.php/patria/article/view/1092
Hari Prasad, N., Rajyalakshmi, G., & Sreenivasulu Reddy, A. (2014). A typical manufacturing plant layout design using CRAFT algorithm. Procedia Engineering, 97(December 2014), 1808–1814. https://doi.org/10.1016/j.proeng.2014.12.334
Irawan, D. (2020). Peningkatan Daya Saing Usaha Micro Kecil dan Menengah Melalui Jaringan Usaha. Coopetition: Jurnal Ilmiah Manajemen, XI(2), 103–116. https://www.neliti.com/id/publications/325683/
Kovács, G., & Kot, S. (2017). Facility layout redesign for efficiency improvement and cost reduction. Journal of Applied Mathematics and Computational Mechanics, 16(1), 63–74. https://doi.org/10.17512/jamcm.2017.1.06
Mufida, I., Kurniati, R. R., & Zunaida, D. (2019). Pengaruh Faktor Bahan Baku dan Bahan Penolong Terhadap Produksi. Jiagabi, 8(1), 51–58.
Muin, M. (2017). Pengaruh Faktor Produksi Terhadap Hasil Produksi Merica Di Desa Era Baru Kecamatan Tellulimpoe Kabupaten Sinjai. Jurnal Economix, 5(2), 203–214. https://ojs.unm.ac.id/economix/article/view/5374/3114
Mulyadi, M. (2011). Penelitian Kuantitatif Dan Kualitatif Serta Pemikiran Dasar Menggabungkannya [Quantitative and Qualitative Research and Basic Rationale to Combine Them]. Jurnal Studi Komunikasi Dan Media, 15(1), 128.
Nadia, N., & Lai-Soon. (2016). Heuristics and Metaheuristics Approaches for Facility Layout Problems : A Survey. Pertanika Journal of Scholarly Research Reviews, 2(3), 62–76. http://www.pjsrr.upm.edu.my/
Okpala., Chikwendu., & Okechukwu. (2016). Plant Layouts’ Analysis and Design. International Journal of Advanced Engineering Technology E- Int J Adv Engg Tech, July 2016, 201–206.
Pratiwi, I., Muslimah, E., & Aqil, A. W. (2012). Perancangan Tata Letak Fasilitas Di Industri Tahu Menggunakan Blocplan Indah. Jurnal Ilmiah Teknik Industri, 11(2). https://doi.org/10.20961/performa.17.2.29664
Priyono. (2016). Metode Penelitian Kuantitatif (2016th ed.).
Puspita, I. A., Iqbal, M., Pratami, D., & Pratomo, A. (2015). Production facility layout design using blocplan algorithm. Advanced Science Letters, 23(5), 3917–3920. https://doi.org/10.1166/asl.2017.8260
Sari, D. I. (2018). Analisis Depresiasi Aktiva Tetap Metode Garis Lurus dan Jumlah Angka Tahun PT Adira Dinamika. Jurnal Moneter, V(1), 86–92.
Setiyawan, D. ., Qudsiyyah, D. ., & Mustaniroh, S. . (2017). Usulan perbaikan tata letak fasilitas produksi kedelai goreng dengan metode blocplan dan corelap (studi kasus pada UKM MMM di Gading Kulon, Malang). Jurnal Teknologi Dan Manajemen Agroindustri, 6(1), 51–60. https://industria.ub.ac.id/index.php/industri/article/view/263
Siregar, R. M., Sukatendel, D., Tarigan, U., Industri, D. T., Teknik, F., Utara, U. S., & Handling, M. (2013). Perancangan Ulang Tataletak Fasilitas Produksi Dengan Menerapkan Algoritma Blocplan Dan Algoritma Corelap Pada Pt. Xyz. Jurnal Teknik Industri USU, 1(1), 35–44.
Tarigan, U., Tarigan, U. P. P., & Rifangi, A. R. (2018). Application of lean manufacturing method and BLOCPLAN algorithm for productivity improvement of a laundry soap bar production. MATEC Web of Conferences, 197. https://doi.org/10.1051/matecconf/201819714004
Tongur, V., Hacibeyoglu, M., & Ulker, E. (2020). Solving a big-scaled hospital facility layout problem with meta-heuristics algorithms. Engineering Science and Technology, an International Journal, 23(4), 951–959. https://doi.org/10.1016/j.jestch.2019.10.006
Tripathi, R. (2020). Plant Layout – Types and Trends. International Journal of Scientific and Research Publications, 1(1), 1–6.
Turanoğlu, B., & Akkaya, G. (2018). A new hybrid heuristic algorithm based on bacterial foraging optimization for the dynamic facility layout problem. Expert Systems with Applications, 98(October), 93–104. https://doi.org/10.1016/j.eswa.2018.01.011
Ulfauzi, Z., Artana, K. B., & Handani, D. W. (2020). Application of BLOCPLAN algorithm as liquified natural gas (LNG) regasification terminal design method. IOP Conference Series: Earth and Environmental Science, 557(1). https://doi.org/10.1088/1755-1315/557/1/012021
Vaidya, R. D., Shende, P. N., Ansari, N. A., & Sorte, S. M. (2013). Analysis of Plant Layout for Effective Production 501. 3, 500–504.
Yuliarty, P., & Widiarto, I. (2014). Perancangan ulang tata letak lantai produksi menggunakan metode systematic layout planning dengan software blocplan pada PT. Pindad. Jurnal Ilmiah Teknik Industri, 2(3), 159–167.
Zúñiga, E. R., Moris, M. U., Syberfeldt, A., Fathi, M., & Rubio-Romero, J. C. (2020). A simulation-based optimization methodology for facility layout design in manufacturing. IEEE Access, 8, 163818–163828. https://doi.org/10.1109/ACCESS.2020.3021753