Penerapan Metode Hazop dalam Identifikasi Bahaya dan Pengendalian Risiko K3 pada Proyek LRT Jakarta Fase 1B

  • Najwa Putri Indra Program Studi Teknik Sipil, Fakultas Teknik, Universitas Negeri Padang
  • Ari Syaiful Rahman Arifin Program Studi Teknik Sipil, Fakultas Teknik, Universitas Negeri Padang
  • Fitra Rifwan Program Studi Teknik Sipil, Fakultas Teknik, Universitas Negeri Padang
  • Totoh Andayono Program Studi Teknik Sipil, Fakultas Teknik, Universitas Negeri Padang
Keywords: HAZOP, OHS Risk Control, LRT Project

Abstract

LRT (Integrated Rail Transit) is a public transportation system developed by PT. Kereta Api Indonesia (KAI) to facilitate mobility for residents of Greater Jakarta (Jabodetabek). The objectives of this study are: 1) identifying high-risk construction projects, 2) applying the HAZOP method to identify hazards and deviations in work processes, 3) assessing risk levels based on likelihood and severity parameters, and 4) providing risk control recommendations based on the HAZOP analysis results. This research is a descriptive analytical study with a qualitative-quantitative approach, conducted on the Jakarta LRT Phase 1B Project, Velodrome–Manggarai Segment, implemented in January 2026. Data collection involved field observations, interviews, questionnaires, and documentation. The results indicate: 1) Identification of High-Risk Work: High-risk construction work in the LRT Phase 1B project includes the use of heavy equipment (jack hammers), concrete casting, girder lifting, electrical installation, and welding processes. 2) The application of the HAZOP method is effective in identifying potential hazards and deviations in various work processes. 3) Risk assessment based on likelihood and severity indicates the greatest risks are in girder lifting and concrete casting. 4) Risk control through technical measures (e.g., low-vibration work methods, strict supervision, use of PPE), administrative measures (SOPs, training), and physical protection (electrical protection, barricades) is essential to reduce occupational risks.

 

Downloads

Download data is not yet available.

References

Abrar, N., & Tamin, R. Z. (2023). “Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) Pembangunan Skybridge Stasiun Kiaracondong.” JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION. 8(2). Hlm. 190–197. https://doi.org/10.31289/jcebt.v7i2.10216

Agung Wahyudi Biro Perencanaan, O., Perhubungan Jl Medan Merdeka Barat No, K., Gambir, K., & Jakarta Pusat, K. (2024). “Strategi Kebijakan Peningkatan Sektor Transportasi Publik Di Jakarta Menuju Net Zero EmissioN.” Juremi: Jurnal Riset Ekonomi. 4(2). Hlm. 557–570. https://doi.org/10.53625/JUREMI.V4I2.8640

Amin, M., Salim Dahdah, S., & Priyana, E. (2025). “Identifikasi bahaya dan penilaian risiko kecelakaan kerja di area perkantoran pt. Wasa mitra engineering dengan metode hiradc dan metode fta.” Intecoms: Journal of Information Technology and Computer Science. 8. Hlm. 1605–1613. https://doi.org/10.31539/y7ve0894

Appicharla, S. (2015). Application of Cognitive Systems Engineering Approach to Railway Systems (System for Investigation of RailwayInterfaces). https://doi.org/10.5772/61527

Ariesta, R. A., Indianto, A., & Yanuarini, E. (2022). “Reduksi Lendutan Pci Girder Dengan Pemasangan Diafragma.” Prokons: Jurnal Teknik Sipil. 16(2). Hlm. 64–70.

Arimba, A., & Rijaluddin, A. (2024). “Teknis Pelaksanaan Erection dengan Metode Tandem Crane pada Steel Box Girder Jembatan Cikeruh.” SEMINAR TEKNOLOGI MAJALENGKA (STIMA). 8. Hlm. 233–243. https://doi.org/10.31949/STIMA.V8I0.1164

Bachtiar, Z., & Pasaribu, R. (2024). “Dampak Lingkungan Ekologis akibat Proyek Pembangunan Jalur Rel Light Rapid Transit (LRT) Jabotabek di Jakarta.” Local Engineering. 1(1). Hlm. 1–10. https://doi.org/10.59810/lejlace.v1i1.24

Choi, J. Y., & Byeon, S. H. (2020). “HAZOP Methodology Based on the Health, Safety, and Environment Engineering.” International Journal of Environmental Research and Public Health 2020, Vol. 17, Page 3236. 17(9). Hlm. 3236. https://doi.org/10.3390/IJERPH1709323

Erliana, C. I., & Azis, A. (2020). “Identifikasi Bahaya Dan Penilaian Risiko Pada Stasiun Switchyard Di Pt.Pjb Ubj O&M Pltmg Arun Menggunakan Metode Hazard Identification, Risk Analysis And Risk Control (HIRARC).” Industrial Engineering Journal. 9(2). https://doi.org/10.53912/IEJM.V9I2.575

Feng, X., Dai, Y., Ji, X., Zhou, L., & Dang, Y. (2021). “Application of natural language processing in HAZOP reports.” Process Safety and Environmental Protection. 155. Hlm.41–48. https://doi.org/10.1016/J.PSEP.2021.09.001

Marhavilas, P. K., Filippidis, M., Koulinas, G. K., & Koulouriotis, D. E. (2020). “A HAZOP with MCDM Based Risk-Assessment Approach: Focusing on the Deviations with Economic/Health/Environmental Impacts in a Process Industry.” Sustainability 2020, Vol. 12, Page 993. 12(3). Hlm. 993. https://doi.org/10.3390/SU12030993

Nurhijrah, N. (2018). “pencegahan resiko kecelakaan jatuh dari ketinggian pada pekerjaan industri konstruksi di indonesia.” Pena teknik: Jurnal Ilmiah Ilmu-Ilmu Teknik. 3(1). Hlm. 85–92. https://doi.org/10.51557/PT_JIIT.V3I1.172

Shringi, A., Arashpour, M., Golafshani, E. M., Rajabifard, A., Dwyer, T., & Li, H. (2022). “Efficiency of VR-Based Safety Training for Construction Equipment: Hazard Recognition in Heavy Machinery Operations.” Buildings 2022, Vol. 12, Page 2084. 12(12). Hlm. 2084. https://doi.org/10.3390/BUILDINGS12122084

Simanjuntak, N., Noviantie, H., Kafolakari, S., & Hermawan, A. (2025). “Pencegahan Resiko Kecelakaan Jatuh Dari Ketinggian Pada Pekerjaan Industri Konstruksi di Indonesia.” Journal of Occuptional Health and Safety. 1(1). Hlm. 29–32.

Published
2026-03-10
How to Cite
Indra, N., Arifin, A., Rifwan, F., & Andayono, T. (2026). Penerapan Metode Hazop dalam Identifikasi Bahaya dan Pengendalian Risiko K3 pada Proyek LRT Jakarta Fase 1B. Jurnal Penelitian Dan Pengkajian Ilmiah Eksakta, 5(1), 97 - 108. https://doi.org/10.47233/jppie.v5i1.2513