Boy, Wendi, Randi Erlindo, and Ridho Fitrah. 2021. “FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG KULIAH PADA MASA PANDEMI COVID 19”. JURNAL RIVET 1 (01), 57-64. https://doi.org/10.47233/rivet.v1i01.231.