Boy, W., Erlindo, R., & Fitrah, R. (2021). FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG KULIAH PADA MASA PANDEMI COVID 19. JURNAL RIVET, 1(01), 57-64. https://doi.org/10.47233/rivet.v1i01.231